05-NPD vortex pump installation site requirements

<

05-NPD vortex pump in the installation of the venue what are the requirements? Now we introduce the 5-NPD vortex pump installation site requirements. 05-NPD vortex pump installation site requirements (1) 05-NPD vortex pump installed in the surrounding temperature below 40 ℃, humidity less than 95% at an altitude of 1000m below the site. (2) Please try to choose a well-ventilated, dust-less installation site. (3) Please select the place for maintenance and inspection. (4) In order to prevent unrelated persons from approaching the pump, please set protective measures such as guard. (5) Install as close as possible to the source of water, suction height (height from suction level to pump center), and suction pipe short. Further reading: China Construction Water Expo Guangzhou Industrial Expo leader ring Pump manufacturers ranking Industrial Internet (Xiamen) Technology Co., Ltd. Asia Pump Network Editor: He Daohui (QQ / WeChat:) http://beng.liuti.cn/ (Services Hotline:)

Din Drainage Upvc Fitting

Pvc Elbow,Sewage Pvc Elbow,Sewage Pvc Coupling,Sewage Pvc Plug

Zhejiang Huangyan Minghua Plastic Pipe Fitting CO.,LTD , https://www.pipefitting-mh.com