LEDER technology`s mirror with light which has the sleek linear profile creates a perfect, contemporary backdrop for unique glass options. Tiles of either clear crackle glass or clear staggered rock glass are set in an organic version of a subway tile look and allow the LED light to shine through, adding rich sparkle to the room. Fixtures have a CCT of 3000K.
With its unique circular, movable lights, this vanity light allows you to customize your bathroom lighting to focus on the areas that need it the most.A vanity light like this two-light piece is perfect for crowning your sink and mirror combo, casing illumination down on your while you prep for your day. Crafted from a slim metal mount , this piece features three streamlined holders with clear glass cone shades that lend it a sleek, modern look.
Features:
• Unique design
• Good waterproof performance
• Artificial Intelligence Technology
• Energy conservation
• Easy installation and maintenance
• Color temperature :3000k-6000K
• The price is reasonable and satisfactory
• Type of protection: IP20
• Warranty for bulbs :2 years
And since it's designed for damp spaces, you can take that extra-steamy shower without worrying.These mirrors undergo rigorous testing to ensure their quality and longevity.Simply touch the square button for 3 seconds to change light intensity from normal to brightest. The mirror has a memory function.
We have rich production experience in lighting.Except Decoration Lighting , we also offered other product in Indoor Lighting .Such as :
LED Panel Light , Track Light , Linear Light ,Wall Light , LED Strip Light , LED Tube Light , Cabinet Light , LED Bulb , LED Ceiling Light as so on .
Light Up Vanity Mirror,Best Makeup Mirror,Light Up Makeup Mirror,Diy Vanity Mirror JIANGMEN LEDERLIGHT LIGHTING Co.,LTD , https://www.ledlightoutdoor.com
Xiangshan Hydropower Plant is located in the middle reaches of the Fabela River in Heihe City. The dam site is 72 kilometers away from the urban area of ​​Heihe River. It is a water conservancy project that focuses on power generation, taking into consideration flood control, fish farming, and tourism environmental protection. It is the second batch of rural electrification pilot counties (cities) power projects, and the province's "eighth five" period of key construction projects. Xiangshan Hydroelectric Power Plant was established in 1992 and was officially connected to the grid in September 1997. The total project investment was 163.34 million yuan and the total installed capacity was 18,000 kilowatts. Up to now, the unit has been operating for 69120 hours, generating 358.86 million kWh of electricity, generating 33.35 million kilowatt-hours of electricity online, achieving a sales income of 98.58 million yuan, and paying taxes of 12.357 million yuan. It will play an important role in the economic development and social progress of Heihe City.
According to reports, due to the reservoir dam reinforcement, the reservoir can not normally store water, so that the power plant can not play its due benefits. In 2007, under the strong support of the Heihe Municipal CPC Committee and the municipal government and related departments at higher levels, Xiangshan Hydro Power Plant actively sought for 20 million yuan of engineering construction funds through various initiatives to ensure the smooth implementation of reservoir reinforcement projects. In December 2009, the Xiangshan Reservoir Danger Reinforcement Project passed the final acceptance of the Provincial Water Resources Department. With the consent of the Provincial Water Resources Department, the acceptance of this project is equal to the acceptance of the entire project of Xiangshan Hydropower Plant. Xiangshan Reservoir has since then received ** in the country. Xiangshan Hydropower Plant has obtained the “Electric Power Business License†issued by the State Electricity Regulatory Commission. As of the end of September, the reservoir has achieved a storage capacity of approximately 395 million cubic meters, generating 35.4 million kilowatt-hours of electricity.
Excavate internal potential, reduce production costs, and do everything possible to increase business efficiency. Xiangshan Hydropower Plant started with detailed management, invested more than RMB 500,000, and blocked the reservoir's annual diversion tunnel with 30 million cubic meters of water flowing through it. This year alone, it can increase the company’s income by more than RMB 1 million. Due to the limitation of power plant production conditions, the power plant is divided into living areas and production areas. Before 2007, there was a boiler in each of the two districts to ensure winter heating. The annual heating cost was more than 500,000 yuan. However, from October to May each year, the heating period is also the dry period of the reservoir. The reservoir water level cannot meet the power generation production, and production can only be stopped. A dozen people are on duty, and two boilers provide heat, causing great waste. In order to save expenses, the factory leadership team boldly tried to abandon the production of boilers in the living quarters, and on the premise of guaranteeing the operation of the power plants, it reduced the number of on-duty personnel in other departments, and more than a dozen on-duty personnel were moved to the production office area of ​​the power plant. After the practice from 2008 to 2009, there was no damage to water supply pipes, floor tiles, and sanitary ware, whether it was the mainstay of the staff accommodation building or the office building. In order to improve the insulation effect and save coal, the main factory building was changed from the original steel window to plastic steel window, so that the power plant boiler can save 150 tons of coal annually. Reducing heating area and strengthening insulation can save nearly 400,000 yuan annually. At the same time, it effectively reduces carbon dioxide emissions and saves energy.
Raising funds, diversified operations, and boosting corporate development. In 2007 and 2008, due to encountering dry weather, the rainfall was greatly reduced, the reservoir water level was extremely low, and normal power generation was not possible, resulting in less income. In order to reverse the operational difficulties, the enterprises actively owed money and recovered nearly 2 million yuan of funds. In 2010, the company succeeded in repurchasing 64 million yuan of non-performing assets with 6.35 million yuan through multiple efforts and efforts. The company also develops reservoir tourism to increase revenue. At present, Xiangshan Reservoir Scenic Tour has been included in the city's tourism planning, and the Ministry of Water Resources has been rated as a water conservancy landscape tourism enterprise, accumulating more than 5,000 domestic guests. At the same time, after the completion of the risk elimination of Xiangshan Reservoir, with the advantage of large reservoir area and good water quality, it has invested nearly 6 million fish fry for three consecutive years since 2007, and it will produce benefits next year and increase revenue for enterprises.
Expand the area of ​​staff quarters, build entertainment venues for staff and workers, improve accommodation conditions for staff and improve the quality of life of staff. In order to ensure that the employees have a good rest environment, the company has overcome the financial difficulties and newly added a floor to the original two-story dormitory building, which has doubled the area for the employees. The staff consisted of 8 people in one room, 2 people in one bed, 4 people in one room, and 1 bed in each person. At the same time, all beds in the dormitory were updated, and new wardrobes were added. On this basis, the Xiangshan Hydropower Plant has also built a staff cultural and recreational center. During the rest period, employees can read books, go to chess and cards rooms, table tennis rooms, and billiards rooms to perform appropriate cultural and sports activities. The improvement of these living conditions has greatly mobilized the employees' enthusiasm for production. The employees' work enthusiasm has been high, their enthusiasm has been vigorous, and they have made strenuous efforts. This has created an unprecedented united and progressive work situation.
Annual output of Heihe Xiangshan Hydropower Plant hit a record high
Heihe Xiangshan Hydropower Plant actively raises funds, strengthens construction, refines management, and taps potential and efficiency. After the construction of the reservoir dam reinforcement project, it provides a scientific guarantee for the record-breaking and high innovation of the power generation of the power station. This year, the water storage height of the Xiangshan Hydropower Plant reached a record high of 281.75 meters, and it is expected that the annual power generation will reach a record high, reaching 41 million kilowatt-hours, and it will reach the design output for the first time since the establishment of the station.