It can be said that the hydropower reform is the most important part of the renovation, because whether it is a waterway or a circuit is necessary in our daily life, but the general practice is to hide it. Once a problem arises, you want to repair it. Extremely inconvenient, so pay more attention to the installation, which home installed hydropower installation what? Let's take a look with Xiaobian. Home-installed water and electricity installation should pay attention to what, one part of the waterway 1, before the waterway reform must first consider all the need to use water equipment, such as toilets, sinks, washing machines, water heaters, etc., to understand the installation location of these devices and whether the hot and cold water should have both the other waterways. Especially water heaters, its hot water way is to choose gas or electricity, and their waterways are different. 2, before the waterway reform, but also to suppress test, this test can be done in the room when the room inspection, water pressure test needs owners, property, decoration team and other personnel on the scene, have a better solution to the problem. When suppressing, it is best to ask professionals to help. 3. When the renovation is started, the extra floor drain must be closed. In particular, the gap between the drain pipe and the floor drain must be blocked to prevent overflow of the water. 4, the bathroom out of the basic water heaters, wash basins, toilets, washing machines and other equipment need to be reserved outside the outlet, usually more than one outlet, to mop and other water-saving convenience. 5, waterway transformation is completed, but also to conduct a pressure test, this time we must pay attention, because many of the decoration team is not to suppress the test, if you do not require it, it is easy to be deceived. Home installation water and electricity installation should pay attention to what two circuit part 1. When the circuit is designed, it should pay attention to its feasibility, possibility and usability, etc., and a reasonable layout plan can avoid the situation of random wire pulling on the wall. To take full account of its flexibility, especially in the area where electrical appliances are concentrated, it is possible to connect a patch panel. This avoids full-wall sockets and affects aesthetics. 2, the circuit socket in the layout of the layout to design a good location, such as the bedroom bedside socket, can not appear behind the bedside cabinet, can not rely on too much from the bed, will affect the use. If the outlet is not properly arranged, it will conflict with the placement of furniture and electrical installation. 3, the circuit in the design should consider the lighting switch is convenient, especially the bedroom, the stairs must be dual control, so that more convenient to use. The kitchen socket is preferably equipped with a switch function to avoid the need to pull out the plug when using electric appliances such as rice cookers. 4. We should also pay attention to the positions of telephone sockets, network cable sockets, etc. in weak currents. This can be arranged according to the living habits of the owners. Editor's Note: The above is about home improvement and installation of hydropower in the installation process to pay attention to what to introduce, I hope the contents of Xiaobian can give you some reference, if you want to learn more about the decoration of knowledge, we can focus on our website information. Home-installed hydropower Carbon Steel Bend,Carbon Steel Pipe Fittings, Carbon Steel Butt Welding Fittings Cangzhou Youlong Pipe Fitting Manufacturing Co., LTD , https://www.youlongpipe.com