Into the winter, people who bought a new house to prepare for renovation usually hold the traditional concept of “not to be allowed to touch the earth†and wait until the spring season starts to work again. In fact, as long as the construction process is in compliance with the standards, there are strict construction management measures to support, and the same as the winter renovation construction, you will be in the new house with a good spring mood as soon as possible. Note 1 The design is not greedy "warm" In the pre-decoration design section, it is important to remind everyone that during the winter home design, it is easy to create the illusion of “warmthâ€. Naturally, I like some warmth, but if the whole room is too warm, it will feel like summer. heat. Therefore, it is appropriate to adopt appropriate colors in China. Even if you like a very warm or cold color, you need to have a moderate color to adjust, such as the middle color of white. Note 2 Temperature difference during construction In the winter in the north, when cold air arrives, the temperature will drop sharply, and low temperatures (especially with high winds) will have an impact on building materials: one is shrinkage, and the other is evaporation of water. Therefore, the main materials used in the decoration, especially wood, should be prepared in advance. It is best to place it in a room with heating equipment for 3 to 5 days so that the moisture content of the wood is close to the level of the house so as to avoid deformation after renovation; sand should be carefully Through sifting, there can be no ice cubes, and some anti-freezing agents can be properly added according to the actual construction requirements. When mixing mortar, the temperature of the water can't exceed 80°C. The cement can't be used in open-air construction, and anti-freeze should be done well; when oil workers spray various paints Should be strictly in accordance with the product description temperature brushing, coating the ambient temperature should not be less than 5 °C, the ambient temperature when the varnish is applied shall not be less than 8 °C, oil work should pay attention to "warm", fully dry and then open Ventilation of doors and windows. Note 3 Wall surface protection against cracking In the winter construction, whether it is a wall brick or a floor tile, it is necessary to transfer from the outdoor to the interior for 24 hours, and when it is adapted to the indoor temperature, it can be paved so as to avoid empty drums and falling off after the construction. Sew. Putty cannot be too thick. Because the indoor air is dry, the water loss is faster, otherwise it is easy to cause emptying, cracking, and wall inequality. In case of severe winds and cooling of the weather, it is not advisable to carry out oil work because dust and dirt are easily attached when the paint and paint are dry. Putty does not dry on the brush coating, the wall is easy to "sweat" or even a large area of ​​cracking, often open window ventilation, the best time to choose the temperature is relatively higher from 10 am to 4 pm. Note 4 wood products reserved gap In the construction of wood products in winter, it is also necessary to “leave a handâ€: the door seam should not be too small, so as to avoid the summer door tight, can not switch freely; when laying solid wood flooring, around 2 mm of expansion joints to leave, otherwise it will cause Drums and dangling phenomenon; when furniture is made, leave about 0.1mm seams to avoid deformation; when the plasterboard ceiling work is carried out, the moisture content of the wood keel must be controlled below 12%, and the keel must be firm and cannot There is a little loosening so that cracks in the plasterboard ceiling can be prevented. Between the gypsum board, between the gypsum board and the wall surface, leave a gap of about 0.5 cm. Use gypsum powder and latex to reconcile the joints. Then double kraft paper and scrape the putty to prevent cracking of the plaster line. Note 5 Acceptance is focused After the winter decoration, the focus of acceptance should be on the left seams, stickers, and patches, and carefully check for cracking. Also look carefully at the floor for obvious gaps and irregularities, and whether the floor and skirting board joints are in close contact. However, some gaps are allowed due to the fact that the wood floors are laid in the winter. Note 6 inspection decoration green After the renovation is completed, after a large number of furniture, carpets, and fabrics are placed in the room, they should be vacant for a few days before being checked in, so as to avoid the concentration of harmful substances that evaporate and pollute the environment. All the furniture should be opened and the clothes should be hung up after a few days. Air detection should be done in time, heating season, air drying, high temperature, poor indoor ventilation, large quantities of harmful substances such as formaldehyde and benzene in the decoration materials such as large core boards and wooden floors, which are likely to cause excessive concentration of harmful substances. A qualified indoor air testing department should be invited to do an air test. If it is not qualified, immediately ask the experts to find out the source of harmful substances, and ask the workers to rework to eliminate hidden dangers. >>> Links: Decorate Literacy Winter Decoration Notes Five benefits of winter decoration Most of the owners who received keys to new houses at the end of the year often put new houses on hold because of the inconvenient factors such as poor temperature conditions in winter construction, inability to recondition heating, and construction in multiple years. In fact, winter decoration is also beneficial. First, in the winter decoration, the temperature difference between indoor and outdoor can test the quality of wood and construction. It only takes a month or two for potential problems to be reflected. At this time, the paint has not yet been painted and can be modified or dismantled. Third, there are relatively few people in winter decoration. Many decoration companies will allow multiple designers to work together to design and provide services. In the same way, the owner’s freedom of choice for the decoration company is also higher, and the modification time and space of the design plan are more abundant. Fourth, the best results are obtained in winter. Because of the low humidity in winter, the paint will dry quickly after being painted, which can effectively avoid the adsorption of dust particles in the air. The effect of brushing out color and quality is excellent. Fifth, the moisture content in wood also reached the lowest point of the year, basically preventing cracking and deformation. Entrance decoration children's room decoration interior decoration decoration design paint new house decoration find decoration company okay floor tile white furniture decoration home
We diviided the led light according to the using eviiroment. Most of our product is the commercial LED Lighting
Commercial lighting is a term used to describe lighting that is used in commercial spaces, including auto dealerships, distribution centers, churches, factories, offices, and warehouses. Unlike residential lighting, commercial lighting is made to withstand more abuse and has a longer lifespan.
While the focus of residential lighting is often on aesthetics, commercial lighting is task orientated. Commercial lighting systems are designed based on what the application is. For example, in an office-type setting, you may see task lighting, which illuminates specific areas where employees need concentrated light to be able to perform their jobs.
Ceiling Light,Hanging Ceiling Light Fixtures,Chandelier Ceiling Light,Dimmable Ceiling Lights Jiangmen Dilin Lighting High-Tech Co., Ltd. , https://www.jmdilinled.com
Second, the winter can be directly experienced heating, room temperature is not ideal can be adjusted at any time, but also at any time exchange of decoration or heating methods.