Daily maintenance and maintenance skills of Nanjing Huake's programmable high and low temperature alternating heat and humidity test chamber

<

In order to ensure the normal operation of the test equipment and prolong its service life, please follow the instructions below to maintain the operation steps. In order to ensure the normal operation of the test equipment and prolong its service life, please follow the instructions below:
Programmable high and low temperature alternating heat and humidity test chamber water system maintenance and maintenance instructions:
1. The machine has been running continuously for more than two months. In order to avoid the blockage of the waterway system or the water quality is contaminated by the test substance, please clean the waterway system.
2, water system description: open the lid of the bucket, add pure water or distilled water, open the total power water will be pumped to the upper tank to the upper and lower cups.
A. The function of the water cup: adjust the water volume of the humidity sensor bar B. The function of the water cup: adjust the water volume of the humidifier bucket to keep the water level of the bucket at 7 minutes.
3. Water level adjustment: Pull the water cup cover up, turn it to the left to raise the water level, and turn it to the right to lower the water level.
4. Humidification bucket water level adjustment:
Adjust the lower lid, rotate to the left to lower the water level of the humidifying bucket, rotate to the right to raise the water level of the humidifying bucket, and adjust the water level to 2/3 of the water level window.
5, humidity sensor rod sink water level adjustment:

Adjust the upper cup, turn to the left to lower the water level of the humidity sensor bar, turn to the right to adjust the water level of the humidity sensor bar, and adjust to the water level of 8 points.
6. Waterway system cleaning steps:
A. Open the machine room door and turn the main power supply down.
B. The drain valve is rotated to the (open) position, the water will be drained back to the lower tank through the return pipe, and the water will be drained back to the lower bucket.
C. Pull back the water pipe, the pump motor power cable connector, and the pumping motor outlet pipe.
D. At this time, the water outlet of the pumping motor will leak out as a normal phenomenon. Please press down the water outlet of the pumping motor with your finger to quickly drain the water in the bucket.
E. After that, each component can be cleaned.
F. After cleaning, put the lower bucket to the position, connect the backwater pumping motor power cable connector, and the pumping motor outlet pipe.
G. Open the lower bucket lid and pour distilled or pure water. The drain valve rotates to the (off) position. H. Finally, the total power supply is turned on. The water will be automatically pumped from the lower bucket to the components of the waterway system.
7, the test box internal cleaning wipe:
In order to avoid oxidation and rust of the gold in the test chamber, please wipe the machine for more than one month, and test the internal sheet metal. The test box wind is removed from the partition plate screws to remove oil or organic solvents such as banana water or pine perfume.

Nanjing Huanke is dedicated to providing customers with more perfect pre-sale, sale and after-sales services! If you need any help, please feel free to call 24 hours customer service.
Http://news.chinawj.com.cn Daily maintenance and maintenance skills of Nanjing Huake's programmable high and low temperature alternating heat and humidity test chamber Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn Daily maintenance and maintenance skills of Nanjing Huake's programmable high and low temperature alternating heat and humidity test chamber

LED Solar Light

Jiangmen Dilin Lighting High-Tech Co., Ltd. , https://www.jmdilinlighting.com