How to accept the FRP sink cover after installation? How to accept the FRP sink cover after installation? Wardrobe Cabinet Handle,Thickened Solid Door Handle,Pure Copper Door Handle,Minimalist Wardrobe Invisible Handle Guangzhou Junpai Hardware Co., Ltd , https://www.gdjhfurniture.com
With the rapid retreat of industries such as fuel chemical, fertilizer, industrial wastewater, medical drugs, aquaculture, urban management and sewage treatment, the purification of many malodorous gases has rapidly increased and significantly affected the surrounding background and the quality of life preserved by many people. It is harmful to our high, low, fat and weak. In order to deal with this current situation, the manufacturer relied on the accumulated consumption experience of the year, and joined the actual state, developed and consumed the FRP glass sump cover deodorant solution, shrouded the hood over the pool body and sealed the exhaust gas. Spillover. The set of deodorizing installations and pipes, fans, pollution towers, etc. form a suitable application to achieve the goal of improving air quality and protecting the background. A FRP cover plate is added above the FRP sump cover. At this time, the exhaust gas and the air generated in the sump are cut off, a vent hole is added on the surface of the gas collecting hood, and a ventilation pipe is installed, and the exhaust gas enters the exhaust gas pollution tower by the ventilation pipe. The large exhaust gas is collected and collected, and the FRP fan is installed in front of the pollution tower. The exhaust gas is sucked into the pollution tower by the fan. The exhaust gas is sprayed in two stages in the tower. If the exhaust gas is acidic, the lye is recycled. If the exhaust gas is alkaline, the gas is taken. The acid circulation is used for reference, and the rate of exhaust gas solution is over 90%. The emission has reached the national unregulated specification. FRP FRP Sewage Tank Cover Cover Pre-construction Acceptance Process FRP FRP Sewage Tank Cover Before the start of construction, the person accepting the position needs to perform quality acceptance and reflection to ensure that the data is not dangerous and suitable for use. What kind of acceptance and introspection process did the FRP FRP sink cover be before the start of construction? The introduction of the above is introduced as follows:
1. The FRP Sewage Tank Cover Manufacturer's start-up process shall reflect the quality of the pre-existing inspection. All persons responsible for the job shall be provided with all irrelevant quality descriptions of the previous process (required for the permit to go abroad), and require the completion of the process quality after each process acceptance. Approved table.
2. In the quality control of the project, it is the quality of the engineering equipment, and it serves as the quality management office of each work area; all the work areas are equipped with full-time quality personnel, and the quality of the work is checked out; the start-up teams set up part-time quality personnel to do self-inspection and mutual inspection. .
3. The experimenter acts as the experimental office of the whole child project. Introspection and supervision urge the sampling, analysis and experimental office of all kinds of purchase data, help the data department to do a good job of inspecting the various purchase materials, and put the good purchase information into the market. The quality is controlled, sampling and inspection are carried out for irrelevant technical purposes, and the production, maintenance, inspection and strength verification of the test block are carried out, and the documents, test and experimental report statements of the purchase materials are used for collection and rectification.
4. The data officer acts as the quality acceptance and reflection of the purchase data. For the purchase of materials, there must be a quality guarantee provided by the supplier, irrespective of the technical parameters and experimental report statements of the manufacturer of the FRP effluent cover. All kinds of materials have entered the scene, and the laboratory staff should perform short-term work according to the standard requirements. And do a good job of spot checks and inspections of the office, no quality policy or spot check is not suitable for the standard of the purchase of materials to prohibit the application, unusual data should be sampled before the purchase of the test, in line with the standard forward access applications. This article URL: http://
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn