Everyone bought a new house for a long time and finally looked forward to the delivery of the room, everyone is naturally very happy, for the first time to buy a new house may be confused: how to check the house? What is the filing procedure? How much does it cost to pay? What should I do if I come across a house problem? The best way to solve these problems is to find out before handing in the house, so that the time will not panic. Xiao Bian also collected some information today to let everyone know about the various issues of the house closing process. First, the collection process - tool preparation Proposal closing date: General real estate agents inform us that the owners will have a shorter time to make the house. It is recommended that you do not go to the house on the first and second day, because in those two days, there will be many people who come to collect the house and escort the house. People do not have much time to escort you to the house carefully, preferably on the third or fourth day. 1) 1 plastic wash basin - for acceptance of the sewage pipeline 2) 1 small hammer - used to check whether the wall and floor of the house is empty 3) 1 feeler gauge - used to measure the width of cracks 4) 1 5 meter tape - used to measure the net height of the house 5) A single multimeter is used to test whether all the power sockets and weak currents are unimpeded 6) 1 calculator for calculating data 7) 1 pen - for signature 8) 1 broom - used for cleaning indoor hygiene 9) 1 small stool and some newspapers, plastic tapes, and packing ropes - used for a long time, you can take a break and seal the sewers in advance. Normal acceptance of the house usually lasts for 2-3 hours. It is recommended to go to 8:30 in the morning or 2:30 in the afternoon. Normal acceptance of the house usually lasts for 2-3 hours. It is recommended to go to 8:30 in the morning or 2:30 in the afternoon. Second, the collection process - data preparation 1) To go to the property department to view the data section, there are the following pieces of information to check: A. The "Residential Quality Assurance Certificate" of the house - can be taken away B. "House Use Instruction" - Can Be Taken C. "Completion Acceptance Record Form" D, area measurement table E. Pipeline distribution as-built drawing (water, strong electricity, weak electricity, structure)--can be taken away If the real estate agent is fully prepared, it is generally possible to view the data in 10 minutes. 2) Verify that the area, contract, and price are more than compensated for. Confirm whether the drawing of the sales contract is consistent with the reality, whether the structure is the same as the original design drawing, whether the housing area has actually been measured by the real estate department, and whether there is any difference in the area signed with the contract. (First look at the sale of the contract, see the error between the number, generally 3%, 3% do not consider, the excess part of the deal, the proposed contract is 2% error, but not more than 5% is better) to both sides The signing of the contract shall prevail. Generally this time varies from person to person, the time is 30-40 minutes. Third, the collection process - acceptance of the house After reading the information, you can basically go to the acceptance of the house, Kevin adviser: Do not first deliver some property costs and related costs, at this time the property will urge you to deliver, can communicate with them, after acceptance, and then delivered Fees. Take the key from the property, there should be a floor key, entry door key, mail box key, water meter, electricity meter (if there is a remote meter reading another) and so on. Then you can go to the house with the property staff. 1) Check the quality of the house in detail, including cracks in doors, windows, balconies, etc.; Tip: Because the new house is empty for a long time, there will be some dust and building debris in the door and window track, so you must not be very impulsive, use brute force to pull the doors and windows, when you feel a sense of blocking, take a closer look, with a broom You can read it clearly 2) Check the flatness of the wall, see if there is water seepage, and if there is a crack Tip: especially check whether there are water traces on some walls, especially some gables, kitchen tops, exterior walls and other places, if any, be sure to check as soon as possible Clear reason. 3) Carefully inspect the ground and carefully inspect the ground for cracks in the empty shell. Tip: If you have any empty drums, you must be obliged to accompany the property personnel to repair them as soon as possible. Otherwise, it will be easy to break through the floors during the renovation and hinder the relationship between neighbors. More than 2-3 available tools for gimmicks and feelers. 4) The smooth flow of utility coal and whether it can be used normally. Open the tap to check for leaks, try to make the water flow bigger and anxious. Let's take a look at the water pressure. Second, try the drainage speed. (General new houses will be equipped with a simple faucet to the owners). Use a multimeter to measure whether each strong or weak power is unblocked. Tip: Close the trip and check if each trip fully controls each branch line. 5) Accept the water situation, first use the basin to hold water, and then to the various water irrigation, respectively, is the basin water, bathtub water, toilet water, kitchen and sanitary and balcony floor drain, etc., basically every sink should be poured into two basins Around the water, you should hear the noise and surface water. Tip: After doing this, make sure that there are no problems. We must put these prominent waters (such as basin water, bathtub water, and toilet water) in a plastic bag to cover the nozzle, and then affix it together. (Remember to leave a place that can be pulled off). 6) Accept the ground water situation. Water is released in the toilet and shallow (about 2cm high). Afterwards, the owners who are downstairs are expected to check the ceiling of their home toilet after 24 hours. Tip: After all the water has been used up, the water meter should be turned on again to see the number of the water meter and record it. At the same time, the number of the meter should be recorded. 7) Check whether the facilities and equipment specified on the sale and purchase contract specified in the sale and purchase contract are missing, and whether the brands and quantities are in compliance; Tip: Usually there should be no big problem in this area, but it is really necessary to verify it carefully. 8) Measure the floor height of the building, use a 5 meter tape, sample the data source location and specific data, preferably water meter, meter number, building height, toilet pit distance, bathtub length and width, shower room size, ceiling The heights are recorded in a small notebook of their own. At the same time, some data and questions on the acceptance of the house are written on the paper provided by the property company. In the end, check the work. If there is no problem, then pay the money. If there is a problem, you need to determine the solution and the date of settlement with the property person to see if the result of the settlement will affect the settlement. If they are affected, they need to negotiate. Now. Summary: After reading this information, we also have a more in-depth understanding of the house-buying process. Actually, there are many details on house acceptance that need careful scrutiny. If you also want to understand these contents, you may wish to continue to pay attention to this site. All you want to see is here. Bathtub balcony house toilet house window residential kitchen sliding door Ball Valve Ansi,Ansi Ball Valve,Ss Flanged Ball Valve,Ansi Flange Ball Valve Wenzhou Dico Valve Technology Co.,Ltd. , https://www.dicovalves.com